Post by Yggdrasil on Jun 11, 2017 14:33:21 GMT
Create a new thread with your proposed highway, tunnel, and bridge plans. Put start and end coordinates of roads and coordinate of any towers along the way. You can post an image with your plan if you would like. Please note when you plan your project and then again when you have finished your project so that we can pay you.
Highways will be paid 1s for every 20x2 stretch.
Tunnels will be paid 3s for every 20X2 stretch.
Bridges will be paid 1.5s for every 10x2 stretch. (must get prior approval on all bridge plans)
Towers will be paid 5s.
These payments are subject to change in the future.
RULES FOR HIGHWAYS
- Must be two tiles wide and have the same slope as each other. Must be flat from side to side.
- Must be paved.
- The slope of the road must not exceed 30. Where possible try to make the roads as smooth as possible.
- Your road must make sense.
RULES FOR GUARDTOWERS
- Must be on deed or beside an official highway.
- Must be 30ql or higher.
- Must be a minimum of 50 tiles apart from other towers.
RULES FOR BRIDGES
- Bridges are counted as part of the highway, the bridge is included in your payment for building a highway.
- Must be 2 tiles wide.
- If the bridge is crossing an important waterway that boats will use then please ensure that boats can still pass underneath by raising the bridge high enough (35 min height required for all boats) and dredging underneath (-21 depth minimum required for all boats)
RULES FOR TUNNELS
- Tunnels may be included as part of a highway and pay is more due to their difficulty.
- Must be 2 tiles wide (not including the entrance/exit tile).
- Walls and floor must be reinforced.
- Must be lit up.
RULES FOR BRIDGES
- Bridges may be included as part of a highway and pay is more due to their difficulty.
- Must be 2 tiles wide .
RULES FOR CANALS & BOAT TUNNELS
- All canal and boat tunnels require planning permission before hand. Payment and rules vary and are up to the discretion of the staff team. These are usually community projects and upon completion everyone who helped is rewarded.
Highways will be paid 1s for every 20x2 stretch.
Tunnels will be paid 3s for every 20X2 stretch.
Bridges will be paid 1.5s for every 10x2 stretch. (must get prior approval on all bridge plans)
Towers will be paid 5s.
These payments are subject to change in the future.
RULES FOR HIGHWAYS
- Must be two tiles wide and have the same slope as each other. Must be flat from side to side.
- Must be paved.
- The slope of the road must not exceed 30. Where possible try to make the roads as smooth as possible.
- Your road must make sense.
RULES FOR GUARDTOWERS
- Must be on deed or beside an official highway.
- Must be 30ql or higher.
- Must be a minimum of 50 tiles apart from other towers.
RULES FOR BRIDGES
- Bridges are counted as part of the highway, the bridge is included in your payment for building a highway.
- Must be 2 tiles wide.
- If the bridge is crossing an important waterway that boats will use then please ensure that boats can still pass underneath by raising the bridge high enough (35 min height required for all boats) and dredging underneath (-21 depth minimum required for all boats)
RULES FOR TUNNELS
- Tunnels may be included as part of a highway and pay is more due to their difficulty.
- Must be 2 tiles wide (not including the entrance/exit tile).
- Walls and floor must be reinforced.
- Must be lit up.
RULES FOR BRIDGES
- Bridges may be included as part of a highway and pay is more due to their difficulty.
- Must be 2 tiles wide .
RULES FOR CANALS & BOAT TUNNELS
- All canal and boat tunnels require planning permission before hand. Payment and rules vary and are up to the discretion of the staff team. These are usually community projects and upon completion everyone who helped is rewarded.